1Z0-1072-25 exam dumps

1Z0-1072-25 practice question 244 of 318

Oracle Cloud Infrastructure 2025 Architect Associate. Associate level, Oracle. Free question with the correct answer and a full explanation.

1Z0-1072-25 Question 244

Single answer

Your data analytics team needs to upload a 100GB dataset to an OCI Object Storage bucket. They want to configure and use a multipart upload to increase reliability and performance. If one of the parts fails during the upload due to a network interruption, which statement correctly describes how OCI handles this situation?

  1. A

    You must restart the entire multipart upload from the beginning and cannot salvage previously uploaded parts.

  2. B

    You can delete the failed part and re-upload just that part without affecting successfully uploaded parts.

  3. C

    You must finalize the upload despite the failed part; OCI automatically fills missing parts with zero data.

  4. D

    You can only resume the upload if you choose identical part sizes for every part, including the last part.

Show answer and explanation

Correct answer: B

Explanation

When configuring multipart uploads in Oracle Cloud Infrastructure, you can retry only failed parts without restarting the entire upload. This is a key advantage for large files or unstable network conditions. For more details, refer to OCI Object Storage documentation on multipart uploads, which explains how re-uploading specific parts works and how to finalize the upload once all parts have been successfully transferred.

  • A. Incorrect.

    Incorrect: In OCI, you do not need to restart from scratch if a part fails. Successfully uploaded parts remain intact while only the failed part needs to be re-uploaded or replaced.

  • B. Correct.

    Correct: OCI� multipart upload feature allows you to re-upload only the parts that failed. Successfully transferred parts are retained, so you do not lose progress.

  • C. Incorrect.

    Incorrect: OCI does not fill missing parts with placeholder data. You must successfully upload each part and explicitly commit the multipart upload before it is finalized.

  • D. Incorrect.

    Incorrect: While choosing a consistent part size is recommended, the last part can be smaller. There's no requirement that all parts must be identical to enable resuming an upload.

Timed practice exam

Take a 1Z0-1072-25 practice test under exam conditions

50 questions in 90 minutes, drawn from this bank, with a score report and a per-question review when you finish.

Start timed exam