2V0-32.24 exam dumps

2V0-32.24 practice question 66 of 249

VMware Certified Professional - Cloud Operations 2024. Associate level, VMware. Free question with the correct answer and a full explanation.

2V0-32.24 Question 66

Select 3

You are tasked with sizing a vRealize Operations deployment for a company that manages 5,000 virtual machines across three vCenter Server instances. The company requires the ability to monitor and analyze performance data, support predictive analytics, and ensure high availability for the platform. Which factors should you consider to determine the appropriate deployment size and architecture?

  1. A

    Number of objects and metrics being collected

  2. B

    The number of vCenter Server instances connected to vRealize Operations

  3. C

    The retention period for historical data

  4. D

    The number of administrators accessing the vRealize Operations interface simultaneously

  5. E

    The number of physical hosts running the vCenter Servers

Show answer and explanation

Correct answers: A, B, C

Explanation

Sizing a vRealize Operations deployment requires consideration of several key factors, including the number of objects and metrics being monitored, the number of vCenter Server instances connected, and the retention period for historical data. These factors directly influence the resource requirements for CPU, memory, and storage. While user access and physical hosts may have some impact, they are not primary considerations for deployment sizing in this scenario.

  • A. Correct.

    Correct. The number of objects and metrics being collected is a critical factor in determining the size of the vRealize Operations deployment, as it directly impacts resource requirements.

  • B. Correct.

    Correct. The number of vCenter Server instances connected to vRealize Operations affects the configuration and architecture, as each vCenter contributes to the overall workload.

  • C. Correct.

    Correct. The retention period for historical data impacts the storage requirements and overall capacity planning for the deployment.

  • D. Incorrect.

    Incorrect. While simultaneous access by administrators may have a minor effect on resource usage, it is not a primary factor in sizing the deployment.

  • E. Incorrect.

    Incorrect. The number of physical hosts running the vCenter Servers is not directly relevant to sizing vRealize Operations, as the focus is on the virtual infrastructure being monitored rather than the physical hardware.

Timed practice exam

Take a 2V0-32.24 practice test under exam conditions

60 questions in 130 minutes, drawn from this bank, with a score report and a per-question review when you finish.

Start timed exam