2V0-32.24 exam dumps

2V0-32.24 practice question 87 of 249

VMware Certified Professional - Cloud Operations 2024. Associate level, VMware. Free question with the correct answer and a full explanation.

2V0-32.24 Question 87

Select 3

You have been tasked with manually installing a new vRealize Operations Manager cluster in your environment. Which steps must you perform during the installation process to ensure the cluster is correctly set up?

  1. A

    Deploy the vRealize Operations Manager appliance using an OVF or OVA template.

  2. B

    Configure the initial node as the master node by providing a cluster name and enabling cluster mode during setup.

  3. C

    Access the vRealize Operations Manager interface and configure the licensing and authentication settings after deployment.

  4. D

    Manually configure the load balancer before adding data nodes to the cluster.

  5. E

    Add data nodes to the cluster and configure them as replicas or data collectors.

Show answer and explanation

Correct answers: A, B, E

Explanation

The manual installation of vRealize Operations Manager involves deploying the appliance using an OVF or OVA template, configuring the initial node as the master node with appropriate cluster settings, and adding data nodes to the cluster. Licensing and load balancer configuration are not part of the initial installation process but are completed at later stages if required.

  • A. Correct.

    This is correct. Deploying the vRealize Operations Manager appliance using an OVF or OVA template is the initial step in the manual installation process.

  • B. Correct.

    This is correct. During the installation, the initial node must be configured as the master node, and cluster settings must be provided.

  • C. Incorrect.

    This is incorrect. Licensing and authentication configuration occurs post-deployment and is not part of the initial installation steps.

  • D. Incorrect.

    This is incorrect. Load balancers are not required during the initial cluster setup; they are configured later if necessary for high availability.

  • E. Correct.

    This is correct. After the master node is set up, additional data nodes must be added to the cluster and configured appropriately.

Timed practice exam

Take a 2V0-32.24 practice test under exam conditions

60 questions in 130 minutes, drawn from this bank, with a score report and a per-question review when you finish.

Start timed exam