VCP-VCF Administrator 2024 Question 115

Select 3

An organization is expanding its VMware Cloud Foundation (VCF) deployment to accommodate a new application workload. As the VMware Cloud Foundation administrator, you have been tasked with adding a new workload domain. What steps must you ensure are completed before initiating the workload domain creation process in the SDDC Manager?

  1. A

    Ensure that sufficient NSX-T Edge clusters are available for the new workload domain.

  2. B

    Verify that the vCenter Server instance is preconfigured for the new workload domain.

  3. C

    Confirm that the physical network configuration matches the requirements for VCF workload domains.

  4. D

    Ensure that ESXi hosts intended for the workload domain meet the compatibility requirements and are unassigned.

  5. E

    Validate that the license for the new workload domain has already been applied to the SDDC Manager.

Show answer and explanation

Correct answers: A, C, D

Explanation

Before adding a workload domain in a VMware Cloud Foundation deployment, administrators must ensure that all prerequisites are met to avoid deployment issues. NSX-T Edge clusters, physical network configuration, and compatible, unassigned ESXi hosts are critical components for a successful deployment. The vCenter Server instance is automatically deployed during the workload domain creation process, and licenses can be applied afterward, making these steps unnecessary beforehand.

  • A. Correct.

    NSX-T Edge clusters must be configured or available to enable network services for the workload domain, such as routing and load balancing.

  • B. Incorrect.

    A new vCenter Server instance is automatically deployed during the workload domain creation process. It does not need to be preconfigured beforehand.

  • C. Correct.

    The physical network must meet specific requirements, such as VLAN configuration, MTU settings, and connectivity, to ensure successful integration of the workload domain.

  • D. Correct.

    ESXi hosts must meet hardware compatibility requirements and should not already be part of an existing workload domain to be added successfully.

  • E. Incorrect.

    Licenses for the workload domain are applied during or after the deployment process. They do not need to be pre-applied in the SDDC Manager.