2V0-41.24 Question 25
Select 3You are configuring an NSX-T Management Cluster for a production environment. To ensure high availability and fault tolerance, which of the following steps are necessary while setting up the cluster?
- A
Deploy exactly two NSX Managers in the cluster for redundancy.
- B
Ensure all NSX Managers are part of the same management cluster.
- C
Configure a VIP (Virtual IP) for the cluster to allow seamless failover.
- D
Enable cluster quorum by having at least three NSX Manager nodes.
- E
Deploy NSX Managers in different regions to avoid latency.
Show answer and explanation
Correct answers: B, C, D
Explanation
To ensure high availability and fault tolerance for an NSX Management Cluster, it is essential to deploy at least three NSX Manager nodes as part of the same cluster to maintain quorum. Configuring a VIP allows for seamless failover, ensuring continuous access to the cluster. Deploying the nodes in different regions is not advisable due to potential latency issues.
- A. Incorrect.
Deploying exactly two NSX Managers is not sufficient for high availability or fault tolerance. At least three nodes are required for quorum in an NSX Management Cluster.
- B. Correct.
All NSX Managers must be part of the same management cluster to function as a unified entity and support high availability.
- C. Correct.
Configuring a VIP (Virtual IP) is a critical step to ensure seamless failover and enable users and applications to connect to the cluster without interruption.
- D. Correct.
A minimum of three NSX Manager nodes is required to maintain cluster quorum and provide fault tolerance.
- E. Incorrect.
Deploying NSX Managers in different regions is not recommended for an NSX Management Cluster, as it can introduce latency and impact cluster performance.